ACARP ACARP ACARP ACARP
Underground

Demonstration of Bit Torque, Load, RPM and Survey Tool

Underground » Ventilation, Gas Drainage and Monitoring

Published: June 02Project Number: C7023

Get ReportAuthor: Ian Gray, Paul Clemence, Gary Paradise, Sean Charlton, Robert Dixon, Peter Hatherly | Sigra, CSIRO Exploration & Mining, CMTE

Geosteering is an oilfield term that refers to directional drilling guidance systems that have on board sensors to determine the rock type either being drilled or in proximity to the drilling head. Geosteering technology allows drills to follow target horizons and return information on the nature of the rocks being drilled. The inability to provide equivalent geosteering capabilities that could allow in-seam drill holes to maintain an intended trajectory within a coal seam is one of the outstanding problems in in-seam drilling. In 1996, Sigra and CMTE began a joint research project aimed at developing a tool to provide geosteering options for in-seam drilling. The tool was to provide a survey capability, drill torque, thrust and rpm measurements, and geophysical measurements of rock resistivity and the spectrum of the natural gamma radiation. It was intended that the tool could reside behind the drill bit and communicate through the drill string via existing communication systems or a cableless system that Sigra was proposing to develop.

The development of geosteering tools has proved to be far more difficult than originally expected. There have been technical issues, issues of developing tools for the intrinsically safe environment and difficulties in being able to undertake trials on drill rigs or in holes, from either the ground surface or underground. Over $1,000,000 has been expended on this project and it has only been able to deliver prototype systems which require significant further development before the ultimate goal of a seeing these tools in routine use can be achieved.

The results from various tests, however, are extremely encouraging and indicate that geosteering is achievable given appropriate commitment. Sigra has demonstrated the acquisition of rock resistivity and drill parameters - torque, pressure and thrust while drilling is underway. The expectation is that the resistivity measurements can indicate the approach of the coal seam roof or floor from the borehole. CMTE has established through the logging of in-seam and vertical boreholes, that spectrometric analysis of natural gamma radiation allows a characteristic seam profile to be monitored and that stone bands in the seam can be distinguished from the roof and floor. The ratio of the counts due to Thorium and Potassium, is particularly diagnostic and when combined with the information on the total radiation, meaningful information about the position of the hole within a seam can be achieved.

All tools have been designed and constructed in consideration of the rigours of the down-hole environment, the needs for intrinsic safety, the needs for power, modularity, down-hole processing and communications. Detailed discussions on these considerations and their implications are provided in the report.

Underground

Health and safety, productivity and environment initiatives.

Recently Completed Projects

C33029Review Longwall Face Ventilation To Mitigate Goaf Gas Emissions Onto Walkways And Tailgate End

As longwall mining increasingly targets deeper coal seams, managing ...

C29009Control Of Transient Touch Voltages During Switching

There have been an increasing number of electric shock incidents rep...

C29025Effectiveness Of Shotcrete In Underground Coal Mines

The primary objective of this project is to quantify the effectivene...

Underground

Open Cut

Safety, productivity and the right to operate are priorities for open cut mine research.

Recently Completed Projects

C33036Radar Tyre Monitor System

This project focussed on trialling a radar sensing technology design...

C26020Preventing Fatigue Cracking Via Proactive Surface Dressing

Fatigue cracking of plant and equipment presents a significant chall...

C33046Rationale For The Use Of Paired Continuous Real Time Noise Monitors To Reduce Uncertainty In The Quantification Of Noise From Open Cut Coal Mines

Numerous experimental studies of varying duration have been undertak...

Open Cut

Coal Preparation

Maximising throughput and yield while minimising costs and emissions.

Recently Completed Projects

C34041A Coal Spiral For The 2020S

The objective of this project is to develop an enhanced coal process...

C33057Foreign Contaminants Detection On Conveyor Belts Using Digital Imaging Processing Techniques And Coal Penetrating Sensors

This project was initiated to tackle the ongoing issue of foreign co...

C29065Wash Plant Fines Testing Methods Enhancement

Accurately estimating the proportion of expected fine size material ...

Coal Preparation

Technical Market Support

Market acceptance and emphasising the advantages of Australian coals.

Recently Completed Projects

C34054Scoping Study: Design Of Cokes From Biomass-Coal Blends For Sustainable Blast Furnace Ironmaking

There is an increasing focus on improving the environmental sustaina...

C34058Strength Development In Fouling Deposits

When coal is combusted in a boiler, the fly ash that is produced flo...

C34059Coke Reactivity With CO2 And H2O And Impacts On Coke Microstructure And Gas Diffusion

With the global shift to low-carbon ironmaking, partial substitution...

Technical Market Support

Mine Site Greenhouse Gas Mitigation

Mitigating greenhouse gas emissions from the production of coal.

Recently Completed Projects

C34066Safe Operation Of Catalytic Reactors For The Oxidation Of VAM Operating Under Abnormal Reaction Conditions

The catalyst Pd/TS-1 has shown excellent activity in oxidising venti...

C28076Selective Absorption Of Methane By Ionic Liquids (SAMIL)

This third and final stage of this project was the culmination of a ...

C29069Low-Cost Catalyst Materials For Effective VAM Catalytic Oxidation

Application of ventilation air methane (VAM) thermal oxidiser requir...

Mine Site Greenhouse Gas Mitigation

Low Emission Coal Use

Step-change technologies aimed at reducing greenhouse gas emissions.

Recently Completed Projects

C17060BGasification Of Australian Coals

Four Australian coals were trialled in the Siemens 5 MWth pilot scale ga...

C17060AOxyfuel Technology For Carbon Capture And Storage Critical Clean Coal Technology - Interim Support

The status of oxy-fuel technology for first-generation plant is indicate...

C18007Review Of Underground Coal Gasification

This report consists of a broad review of underground coal gasification,...

Low Emission Coal Use

Mining And The Community

The relationship between mines and the local community.

Recently Completed Projects

C16027Assessing Housing And Labour Market Impacts Of Mining Developments In Bowen Basin Communities

The focus of this ACARP-funded project has been to identify a number...

C22029Understanding And Managing Cumulative Impacts Of Coal Mining And Other Land Uses In Regions With Diversified Economies

The coal industry operates in the context of competing land-uses that sh...

C23016Approval And Planning Assessment Of Black Coal Mines In NSW And Qld: A Review Of Economic Assessment Techniques

This reports on issues surrounding economic assessment and analysis ...

Mining And The Community

NERDDC

National Energy Research,Development & Demonstration Council (NERDDC) reports - pre 1992.

Recently Completed Projects

1609-C1609Self Heating of Spoil Piles from Open Cut Coal Mines

Self Heating of Spoil Piles from Open Cut Coal Mines

1301-C1301Stress Control Methods for Optimised Development...

Stress Control Methods for Optimised Development and Extraction Operations

0033-C1356Commissioned Report: Australian Thermal Coals...

Commissioned Report: Australian Thermal Coals - An Industry Handbook

NERDDC