Development of Rehabilitation Completion Criteria for Native Ecosystem Establishment on Coal Mines in the Bowen Basin

Open Cut » Environment

Published: May 04Project Number: C12045

Get ReportAuthor: Owen Nichols | Australian Centre for Mining Environmental Research

A significant area of risk associated with mine closure is the question of completion criteria for native ecosystem rehabilitation - will the regulators and the broader community accept defined standards as part of an overall mine closure plan, and agree to lease relinquishment? Both regulators and mining companies are addressing this issue across the country, but there are few examples of mine closure strategies that have been through a full public review process and then been signed off by both the mining company and all regulatory authorities.

The objective of this project was to develop an agreed, workable process for addressing relevant issues relating to mine closure and associated completion criteria when establishing native vegetation communities following coal mining in Queensland's Bowen Basin. The project was intended to reduce the uncertainty relating to completion criteria for native ecosystem establishment.

Work was carried out in two stages. Stage 1, which commenced on 1st March 2003, involved reviewing relevant research and workable processes that have been developed in conjunction with regulators. Ongoing discussions took place with staff at the WA Department of Industrial Resources and mining companies in both WA and Queensland to exchange views on processes for developing completion criteria. A literature review of relevant research conducted in Queensland, NSW and the NT was carried out by the University of Queensland's Centre for Mined Land Rehabilitation.

Site visits were held concurrently with the above reviews. These involved visiting eleven coal mines between Callide and Collinsville, and included all major mines attempting to establish native ecosystems following mining. At each site, discussions with the environmental officer took place, followed by an inspection of rehabilitation and surrounding unmined sites, and a review of relevant company reports.

Following Stage 1, a meeting involving mining industry attendees was held in July 2003 to review progress and plan the work program for Stage 2. Participants selected Anglo Coal's Callide mine and Wesfarmers Curragh mine to be used as case studies to demonstrate how a process for developing completion criteria might work in practice. At the same time, a general approach to addressing issues relating to completion criteria was developed. This includes the selection of specific rehabilitation objectives, design of monitoring programs (including key aspects such as what indicators, parameters and reference sites could be used), suggested techniques for demonstrating sustainability, selection of completion criteria (or at least a process for developing them, in the case of specific ecological targets) and addressing the needs for post-relinquishment management and monitoring.

The findings were synthesised into a set of principles that mines can use in designing monitoring programs and in the selection of rehabilitation completion criteria, reference sites, and key performance indicators. They are designed to assist companies in meeting EPA expectations for obtaining an Environmental Approval, and subsequently fulfilling these requirements. A presentation and draft report outlining the project's findings and recommendations were reviewed by industry participants at a second meeting held in November 2003.

This report explains the process undertaken, and outlines the reviews carried out, the process and guiding principles developed, and the two case studies used to illustrate how they might work in practice.

Underground

Health and safety, productivity and environment initiatives.

Recently Completed Projects

C34007Evaluating Toxicity Of Different Types Of Respirable Crystalline Silica Particles To Lung Cells And Tissues

Silica dust represents one of the most significant occupational haza...

C29010In-Situ Stress Measurement Using Non-Destructive Techniques (Ndts)

Rock in depth is subjected to stresses due to overlaying burden and ...

C33029Review Longwall Face Ventilation To Mitigate Goaf Gas Emissions Onto Walkways And Tailgate End

As longwall mining increasingly targets deeper coal seams, managing ...

Underground

Open Cut

Safety, productivity and the right to operate are priorities for open cut mine research.

Recently Completed Projects

C35029Renewable Energy As Post-Mining Land Use

In 2020, the Queensland Resources Council (QRC), in partnership with...

C33036Radar Tyre Monitor System

This project focussed on trialling a radar sensing technology design...

C26020Preventing Fatigue Cracking Via Proactive Surface Dressing

Fatigue cracking of plant and equipment presents a significant chall...

Open Cut

Coal Preparation

Maximising throughput and yield while minimising costs and emissions.

Recently Completed Projects

C28061Quantitative Based Structural Integrity Evaluations Using Modal Parameters Estimation

This project focused on the development and implementation of a quan...

C34039Development Of A Soft Sensor For Predicting Dense Medium Cyclones Performance

This project details the development of a DMC soft sensor for modell...

C34041A Coal Spiral For The 2020S

The objective of this project is to develop an enhanced coal process...

Coal Preparation

Technical Market Support

Market acceptance and emphasising the advantages of Australian coals.

Recently Completed Projects

C35039Impact Of Coal Grain Composition And Macerals Association On Fluidity Development In Australian Coals

The coke quality prediction models use thermoplastic terms as key ex...

C36004Physical And Chemical Structure Characterisation Of Biomass For Biocoke Production

Partial substitution of coking coal with renewable biomass is identi...

C35037Examination Of Contraction Pre And Post Resolidification Using A High Temperature Dilatation Rig

This project examined the contraction of coking coal samples, both p...

Technical Market Support

Mine Site Greenhouse Gas Mitigation

Mitigating greenhouse gas emissions from the production of coal.

Recently Completed Projects

C34066Safe Operation Of Catalytic Reactors For The Oxidation Of VAM Operating Under Abnormal Reaction Conditions

The catalyst Pd/TS-1 has shown excellent activity in oxidising venti...

C28076Selective Absorption Of Methane By Ionic Liquids (SAMIL)

This third and final stage of this project was the culmination of a ...

C29069Low-Cost Catalyst Materials For Effective VAM Catalytic Oxidation

Application of ventilation air methane (VAM) thermal oxidiser requir...

Mine Site Greenhouse Gas Mitigation

Low Emission Coal Use

Step-change technologies aimed at reducing greenhouse gas emissions.

Recently Completed Projects

C17060BGasification Of Australian Coals

Four Australian coals were trialled in the Siemens 5 MWth pilot scale ga...

C17060AOxyfuel Technology For Carbon Capture And Storage Critical Clean Coal Technology - Interim Support

The status of oxy-fuel technology for first-generation plant is indicate...

C18007Review Of Underground Coal Gasification

This report consists of a broad review of underground coal gasification,...

Low Emission Coal Use

Mining And The Community

The relationship between mines and the local community.

Recently Completed Projects

C16027Assessing Housing And Labour Market Impacts Of Mining Developments In Bowen Basin Communities

The focus of this ACARP-funded project has been to identify a number...

C22029Understanding And Managing Cumulative Impacts Of Coal Mining And Other Land Uses In Regions With Diversified Economies

The coal industry operates in the context of competing land-uses that sh...

C23016Approval And Planning Assessment Of Black Coal Mines In NSW And Qld: A Review Of Economic Assessment Techniques

This reports on issues surrounding economic assessment and analysis ...

Mining And The Community

NERDDC

National Energy Research,Development & Demonstration Council (NERDDC) reports - pre 1992.

Recently Completed Projects

1609-C1609Self Heating of Spoil Piles from Open Cut Coal Mines

Self Heating of Spoil Piles from Open Cut Coal Mines

1301-C1301Stress Control Methods for Optimised Development...

Stress Control Methods for Optimised Development and Extraction Operations

0033-C1356Commissioned Report: Australian Thermal Coals...

Commissioned Report: Australian Thermal Coals - An Industry Handbook

NERDDC